Rock mass management to ensure safe deposit development based on comprehensive research within the framework of the geomechanical model development

Svetlana Sedina1, Assel Altayeva1,2, Lyazzat Shamganova1, Gulnur Abdykarimova1

1Institute of Mining named after D.A. Kunaev, Almaty, Kazakhstan

2Satbayev University, Almaty, Kazakhstan


Min. miner. depos. 2022, 16(2):103-109


https://doi.org/10.33271/mining16.02.103

Full text (PDF)


      ABSTRACT

      Purpose. To create and study a three-dimensional geomechanical model in order to determine the parameters of the open-pit walls and benches, ensuring safe and economically feasible mining, as well as predicting unstable zones within the open pit.

      Methods. A comprehensive methodological approach is used, including a systematic analysis of scientific, normative and methodological literature; analyzing the results of previously performed studies on the object; engineering-geological surveys in the near-edge rock mass of the Kurzhunkul’ deposit; laboratory testing of rock strength properties; determining the rock mass rating according to the MRMR classification; kinematic analysis of bench faces; calculating the stability of the Kurzhunkul’ deposit final boundary using the limit equilibrium method; numerical modeling of the rock mass stress-strain state at the Kurzhunkul’ deposit using the finite element method.

      Findings. The paper represents the results of data collection and analysis for the development of a geomechanical model of an operating iron-ore open pit in the Republic of Kazakhstan. Comprehensive geomechanical studies to substantiate the optimal parameters of the Kurzhunkul’ deposit walls and benches on the limiting contour, as well as calculations to determine the degree of the open-pit walls and benches stability have been performed. Based on the results of studying the geological-structural configuration of the deposit, as well the mathematical modeling data of stability and acting stresses, subsequently entered into a unified digital database, weakened zones have been identified.

      Originality. For the first time, the geomechanical model has been created for the conditions of the Kurzhunkul’ deposit, which makes it possible to combine in one database all the parameters that affect the safety of mining operations. The model takes into account structural disturbances of the rock mass that have an adverse impact on stability.

      Practical implications. The developed model gives a visual representation of the rock mass state at various sites of the deposit, simplifies the selection of design sections for stability calculations, facilitates the choice of optimal technical solutions and analysis, especially for complex geological structures with multiple geotechnical or geological units with different texturing and inclination.

      Keywords: geomechanical model, open pit, fracturing, stability, stress-strain state, rock mass classification, rocks


      REFERENCES

  1. Read, J., & Stacey, P. (2009). Guidelines for open pit slope design. Canberra, Australia: CSIRО, 496 p. https://doi.org/10.1071/9780643101104
  2. Barnewold, L., & Bernd, G. (2020). Identification of digital technologies and digitalisation trends in the mining industry. International Journal of Mining Science and Technology, 30(6), 747-757. https://doi.org/10.1016/j.ijmst.2020.07.003
  3. Bi, L., Wang, Zh., Wu, Zh., & Zhang, Yu. (2022). A new reform of mining production and management modes under Industry 4.0: Cloud mining mode. Applied Sciences, (12), 2781. https://doi.org/10.3390/app12062781
  4. Liao, Y., Deschamps, F., Loures, E.d.F.R., & Ramos, L.F.P. (2017). Past, present and future of Industry 4.0 – A systematic literature review and research agenda proposal. International Journal of Production Research, (55), 3609-3629. https://doi.org/10.1080/00207543.2017.1308576
  5. Cole, M.J. (2006). Geotechnical strategy and tactics at Anglo Platinum’s Pprust open pit operation, Limpopo province, South Africa.https://doi.org/10.13140/RG.2.2.21762.73927
  6. Strukova, O.V., Zakrevskiy, & K.Ye. (2012). 3D modeling. Moscow, Russian Federation: Roxar, 305 p.
  7. Al-Zubaidi, N.S., & Al-Neeamy, A.K. (2020). 3D mechanical earth model for Zubair oilfield in southern Iraq. Journal of Petroleum Exploration and Production Technology, 10(5), 1729-1741. https://doi.org/10.1007/s13202-020-00863-y
  8. Bye, A.R. (2003). The development and application of a 3D geotechnical model for mining optimisation Sandsloot open pit platinum mine South Africa. PhD Thesis. Durban, South Africa: University of Natal, 220 p.
  9. Makarov, A.B. (2006). Practical geomechanics (manual for mining engineers). London, United Kingdom: Mining Book, 391 p.
  10. Biryuchev, I.V., Makarov, A.B., & Usov, A.A. (2020). Geomechanical model of a mine. Part 2. Use. Gornyi Zhurnal, (2), 2271-2278.https://doi.org/10.17580/gzh.2020.02.04
  11. Zhirnov, A.A., Shaposhnik, Yu.N., Nikolsky, A.M., & Neverov, S.A. (2018). Geomechanical assessment and substantiation of mining conditions and mining method for Irtysh deposit. Gornyi Zhurnal, (1), 48-53.https://doi.org/10.17580/gzh.2018.01.08
  12. Biryuchev, I.V., Makarov, A.B., & Usov, A.A. (2020). Geomechanical model of a mine. Part 1. Creation. Gornyi Zhurnal, (1), 1-9.
  13. Ranjbar, A., Hassani, H., & Shahriar, K. (2017). 3D geomechanical modeling and estimating the compaction and subsidence of Fahlian reservoir formation (X-deposit in SW of Iran). Arabian Journal of Geosciences, 10(5), 116.https://doi.org/10.1007/s12517-017-2906-3
  14. Wang, Q., Jiang, B., Xin, Z., He, M., Li, S., Zhang, P., Wang, Y., & Jiang, Z. (2020). Development of a 3D geomechanical model test system for non-pillar mining with automatically formed roadway and its engineering application. Chinese Journal of Rock Mechanics and Engineering, 39(8), 84. https://doi.org:10.13722/j.cnki.jrme.2020.0084
  15. Cotesta, L., Xiang, J., Paudel, B., Sterrett, R., Sjöberg, J., Dilov, T., Vasilev, I., & Yalamov, Z. (2020). Advanced three-dimensional geomechanical and hydrogeological modelling for a deep open pit. Slope Stability: International Symposium on Slope Stability in Open Pit Mining and Civil Engineering, 1383-1398.https://doi.org/10.36487/ACG_repo/2025_95
  16. ISO 14689-1. (2003). Geotechnical investigation and testing – Identification and classification of rock. Part 1: Identification and description.
  17. Berdinova, N.O., Syedina, S.A., Shamganova, L.S., & Kalyuzhny, Ye.S. (2020). Prediction of bench deformations in solid rock of the kurzhunkul quarry using kinematic analysis. Mining Information And Analytical Bulletin, (4), 58-68.https://doi.org/10.25018/0236-1493-2020-4-0-58-68
  18. Livinsky, I.S., Mitrofanov, A.F., & Makarov, A.B. (2017). Integrated geomechanical modeling: Structure, geology, reasonable sufficiency. Gornyi Zhurnal, (8). https://doi.org/10.17580/gzh.2017.08.09
  19. Rakhimov, N.D., & Abdykarimova, G.B. (2020). Laboratory studies of physical and mechanical properties of rocks of the Kurzhunkul deposit. Mining Journal of Kazakhstan, (11), 28-31.
  20. Syedina, S.A., Berdinova, N.B, Shamganova, L.S., & Abdikarimova, G.B. (2020). The fracture study and influence of jointing as geological factors on edges stability. XX International Multidisciplinary Scientific Geoconference, 1(2), 317-323. https://doi.org/10.5593/sgem2020/1.2/s03.041
  21. Deere, D.U., Hendron, A.J., Patton, F.D., & Cording, E.J. (1967). Design of surface and near surface excavations in rock. Proceedings of 8th US Symposium on Rock Mechanics: Failure and Breakage of Rock, 237-302.
  22. Bieniawski, Z.T. (1989). Engineering rock mass classifications. New York, United States: John Wiley & Sons, 251 p.
  23. Hoek, E., Carranza-Torres, C., & Corkum, B. (2002). Hoek-Brown criterion. Proceedings of the NARMS-TAC Conference, (1), 267-273.
  24. Laubscher, D.H. (1990). A geomechanics classification system for the rating of rock mass in mine design. Journal of the Southern African Institute of Mining and Metallurgy, 90(10), 257-273.
  25. Laubscher, D.H., & Jakubec, J. (2001). The MRMR rock mass classification for jointed rock masses. Underground Mining Methods: Engineering Fundamentals and International Case Studies, 474-481.
  26. Syedina, S.A., Abdykarimova, G.B., Altayeva, A.A., & Rakhimov, N.D. (2021). Application of the analysis of kinematic stability to determine rational design parameters of pit benches. Bulletin of the National Academy of Sciences of the Republic of Kazakhstan. Geology and Engineering Series, (1), 135-143. https://doi.org/10.32014/2021.2518-170X.19
  27. The RK Code of Rules 2.03-30-2017. (2017). Construction in seismic regions (zones). Astana, Kazakhstan.
  28. Lv, A., Masoumi, H., Walsh, S., & Hamid, R. (2019). Elastic-softening-plasticity around a borehole: an analytical and experimental study. Journal of Rock Mechanics and Engineering, (52), 1149-1164. https://doi.org/10.1007/s00603-018-1650-7
  29. Yin, Z.Y., Hicher, P.Y., & Jin, Y.F. (2020). Elastoplastic modeling of soils: from mohr-coulomb to SIMSAND. Practice of Constitutive Modelling for Saturated Soils. https://doi.org/10.1007/978-981-15-6307-2_5
  30. Liu, Y.-J., Li, G., Yin, Z.-Y., Dano, C., Hicher, P.-Y., Xia, X.-H., & Wang, J.-H. (2014). Influence of grading on the undrained behavior of granular materials. Comptes Rendus Mécanique, 342(2), 85-95. https://doi.org/10.1016/j.crme.2013.11.001
  31. Лицензия Creative Commons